Evaluation of Precast Patches on U.S. 60 Near the New Kent and James City County Line

Report No: 06-R22

Published in 2006

About the report:

This project evaluated the use of precast concrete patches for repairing jointed concrete pavement. Six patches were placed: three had dowels cast into them during fabrication, and three had dowels inserted in place (dowel bar retrofit). Fabrication and placement were documented. The load transfer efficiency at the joints and the ride quality were determined approximately 2 weeks after construction. After 1.5 years, the general condition of the patches was determined by a visual survey for cracks and spalls. In general, there were no distresses on the replaced slabs except for a few hairline cracks; however, there were failures in the joint area, mainly because of dowels, that were attributed to poor construction practices.

Disclaimer Statement:The contents of this report reflect the views of the author(s), who is responsible for the facts and the accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the Virginia Department of Transportation, the Commonwealth Transportation Board, or the Federal Highway Administration. This report does not constitute a standard, specification, or regulation. Any inclusion of manufacturer names, trade names, or trademarks is for identification purposes only and is not to be considered an endorsement.

Last updated: November 26, 2023

Alert Icon

Please note that this file is not ADA compliant. Choose one of below options: