Field Evaluation of Corrosion Inhibitors for Concrete.

Report No: 99-IR5

Published in 1999

About the report:

Four bridge decks were overlayed and patched and one bridge pier was patched using concrete with and without corrosion inhibiting admixtures. Some concrete surfaces received topically applied corrosion-inhibiting treatments prior to placement of the concrete. The repairs were successfully completed, and the initial condition of the repairs is good. Corrosion probes were installed in many of the repairs, and measurements are being made each quarter to determine macrocell current, macrocell potential, and resistance. The probe indicates that corrosion is occurring in repairs done with and without corrosion-inhibiting treatments. No conclusions can be drawn at this time, and the study will continue for a total of 5 years.

Disclaimer Statement:The contents of this report reflect the views of the author(s), who is responsible for the facts and the accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the Virginia Department of Transportation, the Commonwealth Transportation Board, or the Federal Highway Administration. This report does not constitute a standard, specification, or regulation. Any inclusion of manufacturer names, trade names, or trademarks is for identification purposes only and is not to be considered an endorsement.

Authors

Other Authors

Michael M. Sprinkel, P.E.

Last updated: December 13, 2023

Alert Icon

Please note that this file is not ADA compliant. Choose one of below options: