Construction of a Thin-bonded Portland Cement Concrete Overlay Using Accelerated Paving Techniques

Report No: 92-IR2

Published in 1992

About the report:

The report describes the Virginia Department of Transportations' first modern experience with the construction of thin-bonded Portland cement concrete overlays of existing concrete pavements and with the fast track mode of rigid paving. The study was conducted in cooperation with the Federal Highway Administration (FHWA) and used a paving mixture verified in an FHWA mobile laboratory. The study showed that the fast track mode will permit lane closure times as short as 48 hours. Of special interest was the finding that adequate strength of the bond between the old pavement and the overlay is not dependent on the use of a bonding grout.

Disclaimer Statement:The contents of this report reflect the views of the author(s), who is responsible for the facts and the accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the Virginia Department of Transportation, the Commonwealth Transportation Board, or the Federal Highway Administration. This report does not constitute a standard, specification, or regulation. Any inclusion of manufacturer names, trade names, or trademarks is for identification purposes only and is not to be considered an endorsement.

Authors

Other Authors

 Kenneth H. McGhee

Last updated: December 25, 2023

Alert Icon

Please note that this file is not ADA compliant. Choose one of below options: