Field Measurements on Skewed Semi-integral Bridge with Elastic Inclusion: Instrumentation Report

Report No: 06-R35

Published in 2006

About the report:

This project was designed to enhance the Virginia Department of Transportation's expertise in the design of integral bridges, particularly as it applies to highly skewed structures. Specifically, the project involves extensive monitoring of a semi-integral (integral backwall) bridge with a 45-degree skew. Long-term, continuous monitoring of strains developed in foundation piles, earth pressures exerted on the backwall by the adjacent approach embankment, and concrete buttress reactions preventing the superstructure from rotating in the horizontal plane will be performed. Overall, 120 strain gages, 16 earth pressure cells, and 2 high-capacity load cells, interfaced with electronic dataloggers, will be used in the study. This report provides a record of work carried out from the start of construction in January 2006 to the beginning of May 2006. It specifically describes the instrumentation of the bridge. Future reports will provide an analysis of the results of the field monitoring program. The study is expected to continue for the next 2 years in order to capture the bridge's response over a wide range of climatic conditions.

Disclaimer Statement:The contents of this report reflect the views of the author(s), who is responsible for the facts and the accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the Virginia Department of Transportation, the Commonwealth Transportation Board, or the Federal Highway Administration. This report does not constitute a standard, specification, or regulation. Any inclusion of manufacturer names, trade names, or trademarks is for identification purposes only and is not to be considered an endorsement.

Last updated: November 28, 2023

Alert Icon

Please note that this file is not ADA compliant. Choose one of below options: