Title: |
Guidance for Field Evaluations and Load Ratings of Bridges with Limited or Missing As-Built Data |
Contact: |
Bernard L. Kassner
|
Project No.: |
106342 |
Target Date: |
09/13/2016 |
Abstract: |
The Virginia Department of Transportation (VDOT) posts or restricts allowable gross vehicular weight on a bridge at a conservative level when a structure has no as-built plans available. Even if plans are available, deterioration – detected or not – and missing pertinent design details can make the rating process more complex.
Because VDOT has a large number of such bridges, these load restrictions can affect the level of commerce across Virginia.
This project will develop a “state of the current practice” for VDOT regarding analytical rating practices, augmented by rapid and reliable in-service field evaluation of structures – including nondestructive methods or in-service monitoring – for load-rating purposes.
This synthesis should allow VDOT to use the results to develop a plan to perform these load ratings in-house, create a collaborative partnership with universities or contract these services, with the goal of increasing or eliminating the posting of bridges in a safe manner.
|
|