Title: |
Investigation of Some Issues Related to Electrochemical Chloride Extraction from Reinforced Concrete |
Contact: |
|
Project No.: |
73188 |
Target Date: |
01/05/2006 |
Abstract: |
The purpose of this study is to develop a set of procedures for estimating the optimum electrochemical chloride extraction treatment time for a concrete structure, prior to treatment, and to develop a model with whicht he expected beneficial life and, therefore, the life cycle cost of the treatment of the structure can be estimated. |
|