Return to the VTRC Home Page
Click here to print the printer friendly version of this page.
 
Page Title: Staff Contact




JS.Gillespie@VDOT.Virginia.gov



Team Memberships:
  • Environment, Planning and Economics

  • Projects:
  • 119319 - Efficacy and Safety of Combining Heat Induction and Laser Ablation for the Removal of Potentially Hazardous Bridge Coatings  -  Co-Principal Investigator   
  • 117962 - Cost of Congestion Due to Incidents on Freeways  -  Co-Principal Investigator   
  • 109552 - Implementation of Coating Removal Technique for Steel Components on VDOT Bridges  -  Co-Principal Investigator   
  • 101937 - An Analysis of Benefits of Using Storage Tanks to Store Stormwater Runoff Generated at VDOT’s Maintenance Facilities  -  Co-Principal Investigator   
  • 00059 - Understanding Recent Changes in Traffic Safety Measures and Crash Characteristics in Virginia  -  Co-Principal Investigator   
  • 88821 - Synthesis of Benefits and Costs of Alternative Lane Marking Strategies  -  Co-Principal Investigator   
  • 85364 - Evaluation of Using Higher Percentage of Rap in Asphalt Mixes in Virginia  -  Co-Principal Investigator   
  • 75584 - The Impact of a Smoothness Incentive/Disincentive on Hot-Mix Asphalt Construction and Maintenance-Resurfacing Costs  -  Co-Principal Investigator   

  • Publications:
  • 99-R8 - A Review of the Virginia Department of Transportation's Maintenance Cost Index
  • 98-R12 - Estimating User Costs as a Basis for Incentive/Disincentive Amounts in Highway Construction Contracts
  • 97-R2 - A Review and Update of the Virginia Department of Transportation Cash Flow Forecasting Model
  • 96-R15 - An Assessment of the Construction Advertisement Date Process Within the Virginia Department of Transportation: Final Report
  • 96-IR1 - A Review and Update of the Virginia Department of Transportation's Cash Flow Forecasting Model: Interim Report
  • 95-TAR7 - Technical Assistance Report: I-73 Economic Impact Analysis
  • 94-TAR9 - Interstate 73 Economic Impact Analysis: A Guide to the Methodology and Results, Part 2
  • 94-TAR10 - Interstate 73 Economic Impact Analysis: A Summary and Synthesis
  • 22-R15 - Cost of Congestion Due to Incidents on Freeways
  • 20-R1 - Innovative Coating Removal Techniques for Coated Bridge Steel
  • 17-R24 - An Analysis of the Benefits of Using Underground Tanks for the Storage of Stormwater Runoff Generated at Virginia Department of Transportation Maintenance Facilities
  • 09-R24 - Synthesis of Benefits and Costs of Alternative Lane Marking Strategies
  • 08-R22 - Evaluation of Using Higher Percentages of Recycled Asphalt Pavement in Asphalt Mixes in Virginia
  • 06-R28 - Impact of a Smoothness Incentive-Disincentive on Hot-mix Asphalt Maintenance Resurfacing Costs
  • 05-R8 - The Replace Repair Decision for Heavy Equipment
  • 04-R16 - A Study of the Proposed Virginia Rail Transportation Development Authority
  •