JS.Gillespie@VDOT.Virginia.gov
|
|
|
|
119319
-
Efficacy and Safety of Combining Heat Induction and Laser Ablation for the Removal of Potentially Hazardous Bridge Coatings
-
Co-Principal Investigator
|
117962
-
Cost of Congestion Due to Incidents on Freeways
-
Co-Principal Investigator
|
109552
-
Implementation of Coating Removal Technique for Steel Components on VDOT Bridges
-
Co-Principal Investigator
|
101937
-
An Analysis of Benefits of Using Storage Tanks to Store Stormwater Runoff Generated at VDOT’s Maintenance Facilities
-
Co-Principal Investigator
|
00059
-
Understanding Recent Changes in Traffic Safety Measures and Crash Characteristics in Virginia
-
Co-Principal Investigator
|
88821
-
Synthesis of Benefits and Costs of Alternative Lane Marking Strategies
-
Co-Principal Investigator
|
85364
-
Evaluation of Using Higher Percentage of Rap in Asphalt Mixes in Virginia
-
Co-Principal Investigator
|
75584
-
The Impact of a Smoothness Incentive/Disincentive on Hot-Mix Asphalt Construction and Maintenance-Resurfacing Costs
-
Co-Principal Investigator
|
99-R8
-
A Review of the Virginia Department of Transportation's Maintenance Cost Index
|
98-R12
-
Estimating User Costs as a Basis for Incentive/Disincentive Amounts in Highway Construction Contracts
|
97-R2
-
A Review and Update of the Virginia Department of Transportation Cash Flow Forecasting Model
|
96-R15
-
An Assessment of the Construction Advertisement Date Process Within the Virginia Department of Transportation: Final Report
|
96-IR1
-
A Review and Update of the Virginia Department of Transportation's Cash Flow Forecasting Model: Interim Report
|
95-TAR7
-
Technical Assistance Report: I-73 Economic Impact Analysis
|
94-TAR9
-
Interstate 73 Economic Impact Analysis: A Guide to the Methodology and Results, Part 2
|
94-TAR10
-
Interstate 73 Economic Impact Analysis: A Summary and Synthesis
|
22-R15
-
Cost of Congestion Due to Incidents on Freeways
|
20-R1
-
Innovative Coating Removal Techniques for Coated Bridge Steel
|
17-R24
-
An Analysis of the Benefits of Using Underground Tanks for the Storage of Stormwater Runoff Generated at Virginia Department of Transportation Maintenance Facilities
|
09-R24
-
Synthesis of Benefits and Costs of Alternative Lane Marking Strategies
|
08-R22
-
Evaluation of Using Higher Percentages of Recycled Asphalt Pavement in Asphalt Mixes in Virginia
|
06-R28
-
Impact of a Smoothness Incentive-Disincentive on Hot-mix Asphalt Maintenance Resurfacing Costs
|
05-R8
-
The Replace Repair Decision for Heavy Equipment
|
04-R16
-
A Study of the Proposed Virginia Rail Transportation Development Authority
|