  • Materials

  • Projects:
  • 93240 - Evaluation of the Installation, Initial Condition and Performance of Rosphalt Overlay on Bridge Deck on I-85  -  Co-Principal Investigator   
  • 85827 - SHRPII Performance Specifications  -  Principal Investigator   
  • 86115 - Concrete Volume Change and the Reduction of Associated Cracking  -  Co-Principal Investigator   
  • 82140 - Measurement of Early Age Shrinkage of Virginia Concrete Mixtures  -  Co-Principal Investigator   
  • 83137 - Condition of Concrete Overlays on Route 60 Over Lynnhaven Inlet After 10 Years  -  Principal Investigator   
  • 78408 - Evaluation of Cargill SafeLane Epoxy Overlay  -  Co-Principal Investigator   
  • 69828 - Integrated Inspection and Light Servicing System For High Mast Light Poles  -  Project Manager   

  • Publications:
  • 99-TAR3 - Very-early-strength latex-modified concrete overlay
  • 99-IR5 - Field evaluation of corrosion inhibitors for concrete.
  • 99-IR4 - Evaluation of the installation and initial condition of high performance concrete overlays placed on Route 60 over Lynnhaven Inlet in Virginia
  • 99-IR3 - Evaluation of the installation and initial condition of hydraulic cement concrete overlays placed on three pavements in Virginia
  • 99-IR2 - Evaluation of the installation and initial condition of latex-modified and silica fume concrete overlays placed on six bridges in Virginia
  • 99-IR1 - Field evaluation of corrosion inhibitors for concrete.
  • 99-CR5 - Corrosion protection performance evaluation of low permeable concretes in exposure specimens
  • 99-CR4 - Performance evaluation of corrosion inhibitors and galvanized steel in concrete exposure specimens
  • 99-CR2 - An evaluation of the performance of epoxy-coated reinforcing steel in concrete exposure specimens
  • 98-R42 - Corrosion protection performance of corrosion inhibitors and epoxy-coated reinforcing steel in a simulated concrete pore water solution
  • 98-R4 - Field investigation of the corrosion protection performance of bridge decks and piles constructed with epoxy-coated reinforcing steel in Virginia
  • 97-IR1 - Epoxy-coated reinforcement :a historical performance review
  • 95-TAR2 - Repair and protection of hydraulic cement concrete bridge decks
  • 91-R37 - First annual report SHRP C103 task 4 :rapid repair techniques
  • 91-R19 - Evaluation of the use of high molecular weight methacrylate monomers to seal cracks in decks on I-81 over the New River
  • 91-IR3 - State-of-the-art report on rapid repair techniques for bridge decks
  • 90-TAR2 - A manual for the repair and protection of hydraulic cement concrete bridge decks
  • 90-R8 - Premixed polymer concrete overlays
  • 90-R22 - Polymer-impregnated bridge slabs :performance over 10 years
  • 89-R22 - Evaluation of concrete pavement patching techniques
  • 88-R2 - Comparative evaluation of concrete sealers and multiple layer polymer concrete overlays.
  • 88-R12 - High early strength latex modified concrete overlay
  • 87-R28 - Evaluation of the construction and performance of multiple layer polymer concrete overlays.
  • 86-R37 - Polymer concrete overlay on the Big Swan Creek Bridge :condition of overlay after two years in service
  • 86-R36 - Use of ground-penetrating radar for detecting voids underneath a jointed concrete pavement
  • 85-R34 - Radiant heat curing of concrete
  • 85-R1 - Overview of latex modified concrete overlays :final report
  • 84-R26 - Polymer concrete overlay on the Big Swan Creek Bridge :interim report no. 1--installation and initial condition of overlay
  • 84-R12 - Final report :Polymer concrete overlay on Beulah Road Bridge : condition of overlay after one year in service
  • 83-R29 - Evaluation of the construction and performance of polymer concrete overlays on five bridges :interim report no. 1
  • 83-R28 - Polymer concrete overlay on Beulah Road Bridge :interim report no. 1--installation and initial condition of overlay
  • 83-R23 - Polymer impregnated bridge slabs :interim report, condition of slabs after three years of service life
  • 83-R2 - Precast concrete replacement slabs for bridge decks
  • 82-R7 - Investigation of concrete mixtures incorporating hollow plastic microspheres
  • 82-R56 - Evaluation of the performance of a press-lam timber bridge :bridge performance and load test after five years
  • 82-R32 - Evaluation of Microlon and Technol-G :final report
  • 82-R24 - Effective field use of high-range, water-reduced concrete :final report
  • 81-R37 - The Chace air indicator
  • 81-R22 - Performance of vehicles and equipment involved in the use of gasohol
  • 79-R26 - Glulam timber deck bridges :final report
  • 78-R57 - Evaluation of the performance of a press-lam timber bridge :interim report, no. 2, bridge performance and load test after one year
  • 78-R2 - Evaluation of the performance of a press-lam timber bridge :interim report, no. 1, bridge installation and load test
  • 78-R18 - Investigation of the use of methanol-gasoline blends
  • 77-R50 - Construction of prestressed concrete single-tee bridge superstructures
  • 77-R33 - In-house fabrication of precast concrete bridge slabs
  • 76-R41 - Ramifications of welding a soleplate to a precast metal insert of a prestressed single-tee beam
  • 76-R13 - Two-course bonded concrete bridge deck construction :Interim report no. 1, An evaluation of the technique employed
  • 75-R68 - A comment on the use of polymer-impregnated concrete in bridge decks to achieve a reduction in material volume and first cost
  • 75-R3 - Utilization of steel in industrialized highway bridge systems
  • 72-R19 - A literature survey on industrialized bridge construction
  • 09-R8 - Evaluation of the Cargill SafeLane surface overlay
  • 09-R13 - Condition of concrete overlays on Route 60 over Lynnhaven Inlet after 10 years
  • 08-R9 - Measurement of early age shrinkage of Virginia concrete mixtures
  • 08-CR5 - Parameters governing the corrosion protection efficiency of fusion-bonded epoxy coatings on reinforcing steel
  • 08-CR4 - Bridge deck service life prediction and costs
  • 06-R29 - Summary report on the performance of epoxy-coated reinforcing steel in Virginia
  • 05-R4 - Appliqués for the maintenance of lead-based painted bridges :a laboratory assessment of field-performance characteristics
  • 05-R26 - Latex-modified concrete overlay containing Type K cement
  • 05-R2 - Performance specification for high performance concrete overlays on bridges
  • 04-CR7 - Corrosion protection service life of epoxy-coated reinforcing steel in Virginia bridge decks
  • 03-R14 - Evaluation of corrosion inhibitors for concrete bridge deck patches and overlays
  • 03-CR5 - Evaluation of models for predicting (total) creep of prestressed concrete mixtures
  • 03-CR4 - A Model to predict the impact of specification changes on the chloride-induced service life of Virginia bridge decks
  • 01-TAR1 - Effect of concrete removal equipment and methods on the condition of deck concrete left in place
  • 01-R3 - Evaluation of latex-modified and silica fume concrete overlays placed on six bridges in Virginia
  • 01-R2 - Evaluation of hydraulic cement concrete overlays placed on three pavements in Virginia
  • 01-R1 - Evaluation of high performance concrete overlays placed on Route 60 over Lynnhaven Inlet in Virginia
  • 00-R16 - Field performance of epoxy-coated reinforcing steel in Virginia bridge decks
  •